Pacton Gold has started Phase II drilling at its Sidace project in Red Lake.
The project includes 11,500 metres of drilling and is expected to be completed this Spring.
Phase I drilling has been completed.
Drilling has successfully intercepted widespread gold mineralization in nine holes.
Interim President and CEO Nav Dhaliwal says the results represent a great start to their program.
“Not only has every hole hit mineralization, including high-grade and widespread gold, but we have extended the main zone in all directions. We have also identified broad surrounding mineralization and are excited to test the extent of these areas.”
Pacton is partnered with Evolution Mining on the project and is the current operator.